A guide to installing cedar shingles.
Cedar shingle roof installation guide.
As with the roofing shingles make sure to leave a gap of 1 8 to 1 4 between each shingle to allow for expansion.
This document will help you with the installation of your cedar shake and shingle roofs.
For information regarding the installation and maintenance of your cedar shake or shingle application visit our website for a complete list of resources.
Before installing the shakes the roofer covers the roof deck with 15 or 30 pound roofing felt.
Using this chalk line method extend the first row around the entire shed.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
Click on the below links to view the full application instructions for.
How to install a cedar shingle roof on a garden shed step 1.
Secure it to the.
The jb western red cedar shingles from marley are a lightweight roofing and cladding solution with a high degree of natural thermal insulation.
Looking for a dealer in your area.
Return to all blogs.
Position the first shingle so its end overhangs the edge of the roof by 1 1 4 to 1 1 2 inches.
Before installing siding make sure that flashings are installed to prevent moisture from entering wall and roof spaces.
Flashing intercepts and directs the flow of water away from the building to designed drainage paths.
Use a hammer stapler to fasten it down applying a staple every 12 to 14.
Flashing is an important line of defense in controlling moisture in wall assemblies.
Lap rows of 36 inch wide felt using the provided lap lines as guides.
Nail a shingle at the end of each wall with the proper overhang and snap a chalk line to serve as a guide for the row.
Cover the roof with roofing felt.
Shake shingle roof application instructions feb 10 2017.
Cedar shingle application cedar shake application.
The shingles shall be spaced 6mm apart and be nailed or stapled twice the nails staples should be fixed 19mm in from the edge and 38mm above the butt of the course above.
Joints in any one course should have a side lap of no less than 38mm from the joint in adjacent courses and in any 3 courses no 2 joints should align.
On the left side of the page in the blue section under the heading supporting documents you will find our care maintenance brochure or click here for more information.